The important renovation and energy redevelopment work on this three-family house in the municipality of Pregnana Milanese (MI) is in the start-up phase.
- Energy efficiency in a three-family home
- Pre-intervention energy class: F – post-intervention energy class B
- Deduction ceiling: €639,000
- Construction time: 3 months
The intervention involves a series of works that benefit from the deductions provided for by the 110% Superbonus
In addition to these interventions, recovery works of the building heritage are planned with deductions of 50%:
Here they are in detail:
- Renovation of the external insulation on the ground floor, with the installation of 10 cm thick EPS panels and the finishing application of 1.5 cm thermal plaster. Maximum care and attention in the correction of thermal bridges in the presence of corners and fixtures
- Replacement of all WINDOWS with transparent surface with new elements with a maximum Uw of 1.2 W/m2 °K
- ATTIC INSULATION
- Replacement of the heating/cooling system with the installation of a hybrid HEAT PUMP with a capacity of 31.5kW combined with a 25 kW electricity generator
- Installation of a SOLAR THERMAL SYSTEM integrated with the DHW system equipped with a 2sqm panel and storage capacity of 300 Lt
- Installation of a PHOTOVOLTAIC SYSTEM consisting of 3 panels with a power of 5kWp and equipped with a 15W storage battery
- Renovation of the external flooring and corsello box
BEFORE AND AFTER


The construction site has an expected duration of 3 months with a deduction ceiling of € 639,000 applicable with a discount on the invoice.
