In Italy, permits to renovate a house depend on the type of intervention. For ordinary maintenance, no permit is required (free building). For internal modifications such as partitions and systems, the CILA is required, while for structural works, changes of intended use or volume increases, the SCIA or Building Permit is required.
But let’s not be discouraged, renovating your home remains an exciting journey. Imagining the new spaces, choosing the materials, seeing the project take shape is a source of great satisfaction. However, before laying the first stone or knocking down the first partition, there is an obstacle that scares many owners: bureaucracy.
Navigating the sea of Italian building regulations may seem like a titanic undertaking. Between acronyms such as CILA and SCIA, it is easy to feel disoriented.
Yet, understanding what permits are needed to renovate your home and how to obtain them is essential not only to avoid heavy penalties, but also to ensure the security of your real estate investment.
This guide was created precisely to clarify. We will take you step by step through the different types of building permits, explaining what they are and how to obtain them.
In this article, we will discuss:
- Permessi per ristrutturare casa: 2 concetti chiave che prima devi conoscere
- Quali sono i permessi (titoli) edilizi necessari per ristrutturare
- Quanto costano i permessi per ristrutturare casa?
- Perché i titoli abilitativi nella ristrutturazione sono così importanti?
- Consigli pratici per gestire la burocrazia durante la ristrutturazione di un immobile
- Devi ristrutturare? Ai permessi edilizi ci pensa Interior Tech
- Ristrutturare con Consapevolezza
Permits to renovate your home: 2 key concepts you need to know first
Difference between extraordinary and ordinary maintenance of a property
To better understand what they are and what are the necessary qualifications in the event of renovation, it is important to know the difference between ordinary and extraordinary maintenance.
Ordinary maintenance concerns regular and scheduled interventions, such as cleaning or minor repairs, useful for preventing wear and tear and ensuring the proper functioning of the systems.
In contrast, extraordinary maintenance focuses on more complex and occasional work, such as repairs of significant damage or structural and regulatory adjustments.
The main difference therefore lies in the frequency and complexity of the interventions: ordinary for routine, extraordinary for emergencies or structural and significant improvements.
To learn more about these definitions, we recommend reading our article: Difference between ordinary and extraordinary maintenance.
Free Building: interventions that do not require building permits (titles)
The good news is that you don’t always need a permit. There is a wide range of interventions that fall under the so-called “Free Building”. In these cases, you can proceed without permits.
Which jobs fall under free construction?
Free construction concerns ordinary maintenance and small works that do not alter the structural characteristics of the property, and which do not require building permits. Works aimed at repairing or maintaining systems, finishes and outdoor furnishings without significant innovations are included.
Here are some of the most common cases:
- Painting: Painting walls and ceilings, interiors and exteriors (if there are no landscape or historical constraints).
- Flooring: Replacement of interior or exterior tiles.
- Fixtures: Repair or replacement of doors and windows, as long as the characteristics (materials, color, shape) of the pre-existing ones are maintained.
- Systems: The repair and upgrading of electrical, plumbing or heating systems without innovation can fall under free construction if it is routine maintenance. This includes interventions such as repairs or replacements that do not involve structural changes or significant expansions. For example, for electrical systems it can be the replacement of damaged sockets, switches or cables, while for plumbing systems it can be done repairs to pipes or replacement of taps. As far as heating is concerned, interventions such as replacing radiators or boiler maintenance fall into the same category. However, if the works involve complete renovations, structural changes or bringing the system up to standard, we move on to extraordinary maintenance, which requires the presentation of a CILA (Sworn Notice of Commencement of Works). In any case, it is essential that the work is carried out by qualified technicians, who must issue the declaration of conformity (DiCo) to ensure compliance with current safety regulations.
Important Warnings
Even for free building works it is necessary:
- Comply with condominium regulations and local planning regulations.
- Dispose of rubble and waste materials correctly.
- Check landscape or historical constraints that may require specific authorizations.
What are the building permits (titles) required to renovate
1. CILA: Sworn Notice of Commencement of Works
The CILA is the necessary practice to start light extraordinary maintenance work, i.e. interventions that modify the interior spaces or systems without touching load-bearing structures or changing the volume of the building. It is a communication, not a permit: the works can start immediately after presentation to the Municipality.
When is the CILA needed?
It is used when you change the internal distribution of spaces without touching the structural parts of the building.
Some examples:
- Modification of the internal distribution of spaces without altering the volume and without touching load-bearing structures, such as moving or demolishing non-load-bearing partitions.
- Renovation of bathrooms or kitchens with displacement of sanitary ware or non-significant changes to the plumbing and electrical systems, without intervening on load-bearing walls or creating new systems that require structural works. These are light works within existing spaces.
How to obtain the CILA
Obtaining the CILA is a relatively streamlined process, but it requires the intervention of a professional. You cannot submit it alone.
Phase 1: Assignment to the qualified technician
The first step is to contact a surveyor, an architect or an engineer. The technician will have to carry out an inspection to check the state of the property.
Step 2: Verify compliance
The technician in charge verifies that the property complies with the cadastral plan and the last building permit filed, reports any previous discrepancies and indicates whether it is necessary to remedy them before the works.
Step 3: Design and Presentation
The technician draws up the project and prepares all the necessary documentation for the CILA and accompanies the customer in the presentation to the Municipality and in any cadastral updates, ensuring that the intervention is regular and compliant with the regulations.
The CILA is a “communication”, not a request for authorization. This means that the works can start on the same day of submission. The file is sent electronically to the Single Desk for Construction (SUE) of your municipality.
Phase 4: End of work and cadastral variation
Once the works that modify the floor plan have been completed, the technician communicates the end of the work and updates the cadastral plan to the Revenue Agency, if necessary.

Costs of the CILA
The costs of the CILA may vary according to the municipality and the complexity of the intervention. Indicatively:
- City secretarial fees: Generally between €50 and €250, but some cities may charge slightly higher rates.
- Technician’s fee: usually between €500 and €1,500 for a standard CILA on an average apartment. Lower prices can be found in small municipalities or for very simple jobs, while more complex interventions can be as high as €2,000 or more.
Note: These values are indicative and may vary depending on the city, the type of intervention and the professional in charge. It is always advisable to request a detailed quote before starting the work.
2. SCIA: Certified Notification of Commencement of Activity
The SCIA is necessary for complex extraordinary maintenance, restoration and conservative renovation works that affect internal load-bearing structures, integrated systems or constrained elements. Unlike the CILA, the SCIA concerns more complex works regulated by stricter controls, which do not change the overall shape or volume of the building.
The SCIA allows work to start immediately after registration, even if the Municipality has 30 days to verify the file and request any additions.
When is the SCIA needed?
It is necessary for extraordinary “heavy” maintenance and for conservative restoration and renovation.
Some examples:
- Reinforcements or circles on load-bearing walls, renovation of floors or structural coverings.
- Interventions on systems integrated with load-bearing structures (e.g. plumbing or electrical systems that require structural changes).
- Restoration, conservative rehabilitation or significant extraordinary maintenance involving structural elements.
- Splitting or merging of real estate units that require significant structural or plant modifications, without increasing volume or changing external shape.
How to obtain the SCIA: The bureaucratic process
The procedure is similar to the CILA but more complex and rigorous.
Phase 1: Assignment of qualified technicians
It is necessary to contact one or more professionals (architect and, if you are working on the structures, structural engineer; possible safety coordinator if applicable).
Step 2: Submission of the wake
The technician draws up the project, verifies urban planning and cadastral compliance and prepares all the necessary documentation for electronic submission to the Single Desk for Construction (SUE). If required by anti-seismic regulations, the structural project may have to be filed with the regional technical office or SUE.
The SCIA also allows the immediate start of the works from the date of registration. However, the Municipality has 30 days to check the file and, in case of irregularities, block the construction site or ask for additions. Out of prudence, many recommend waiting these 30 days before starting heavy demolitions.
Phase 3: Testing and Usability
At the end of the work:
- Update the cadastral plan if there have been significant internal changes or changes to the internal intended use.
- Obtain the certificate of structural testing or declaration of regular execution for interventions on load-bearing structures.
- Submit the Certified Notification of Usability (SCA) if the works affect safety, hygiene or relevant systems.
Costs of the SCIA
The costs of the SCIA are higher than the CILA, because they often require the intervention of several professionals and the management of complex works. Indicatively:
- Municipal secretarial fees: generally between € 250 and € 500, which vary depending on the municipality and the complexity of the file.
- Professionals’ fees: considering architect, structural engineer, tester and, if applicable, safety coordinator, costs often start at €2,500–3,000 and can rise depending on the complexity of the intervention, the city and the number of professionals involved.
Note: these values are indicative and may vary according to the type of intervention and the professionals in charge. It is always advisable to request a detailed quote before starting the work.
3. Building Permit (PdC)
The Building Permit is the enabling title necessary for substantial building and urban planning interventions, such as new constructions, extensions or works that modify the shape and volume of the building. It is the most “important” title, what was once called “Building Permit”.
When do I need a Building Permit?
It is used for substantial urban and building transformations.
For example:
- New construction: Building a house from scratch on land.
- Volumetric extensions: Add a room, raise a floor, close a terrace to make it habitable (creation of volumetry).
- “Heavy” building renovation: Interventions that completely distort the building, perhaps demolishing it and rebuilding it with a different shape.
How to obtain the Building Permit: Times and methods
Unlike CILA and SCIA, here it is not enough to communicate: you have to wait for authorization.
Step 1: Application
The technician in charge (architect, engineer or surveyor) draws up the complete project and submits the application to the Municipality.
Phase 2: Preliminary investigation
The Municipality has 60 days to examine the file. The Procedure Manager verifies everything and asks for opinions from other bodies if necessary (e.g. Superintendence for landscape constraints, Fire Brigade, ASL).
Step 3: Release
If everything is compliant, the Municipality issues the PdC. The real times can vary from 3 to 6 months or more in complex municipalities.
How much do permits cost to renovate your home?
Costs include:
- Urbanization charges: contributions for public works such as roads, sewers and services.
- Construction cost: tax calculated as a percentage of the cost of the work.
- Fees of professionals: architect, structural engineer, tester, safety coordinator if applicable.
The figures can vary from a few thousand to tens of thousands of euros, depending on the complexity of the intervention, the municipality and the type of work. In any case, indicatively, the cost of a CILA generally varies between €500 and €1,500, while a SCIA can cost between €1,500 and €3,000. The building permit, on the other hand, involves a higher expense in many cases, which can exceed €3,000–5,000, depending on the complexity of the intervention and the expected charges.
Discover the tax breaks for those who renovate 2026
Why are the qualifications in renovation so important?
Before we dive into the technicalities, it’s helpful to understand the “why.”
Qualifications are not just paper invented to complicate citizens’ lives. They are used to ensure that the works are carried out in compliance with safety, hygiene, seismic and energy efficiency standards.
A property renovated without the necessary permits is an “abuse” property. This involves risks:
- Administrative and criminal sanctions: Heavy fines and, in the most serious cases, criminal proceedings.
- Problems in the sale: A property with discrepancies cannot be sold easily; the notary will not draw up the deed if the state of affairs does not correspond to the plans filed.
- Loss of tax bonuses: Without the correct qualifications, you are not entitled to tax deductions for renovations (Home Bonus, Ecobonus, etc.).
Practical tips for managing bureaucracy during the renovation of a property
Obtaining permits may seem like a maze, but with the right strategy, it becomes manageable.
Here are some golden tips:
- Choose the right technician: The difference between a smooth practice and a bureaucratic nightmare is often made by the professional. Look for someone who has specific experience in your municipality and is familiar with local regulations and technical office officials.
- Check the constraints: Before falling in love with a project, have your home checked if it is subject to constraints (landscape, historical, hydrogeological). A constraint from the Superintendence can block or radically change your plans.
- Don’t be in a hurry: Haste is the enemy of renovations. Submitting an incomplete CILA or SCIA to start work immediately exposes you to the risk of suspension of the construction site. Better to lose two weeks earlier to prepare everything well than to stop three months later with the construction site open.
- Budget for contingencies: In renovations, and also in paperwork, unforeseen events happen. Set aside 10-15% of your budget for any variations or extra requests.
Do you need to renovate? Interior Tech takes care of building permits
Interior Tech follows you throughout the process: from the management of the paperwork of permits to the complete transformation of your spaces, we take care of every aspect of the renovation to offer you a truly simple and innovative experience.
From smart design to flawless execution, our team of experts is by your side every step of the way, offering you cutting-edge interior solutions that combine design, technology and functionality.
Restructuring with Awareness
Renovating your home is a path that may seem complex, but with the right guidance it becomes an exciting opportunity to breathe new life into your spaces.
Inquiring about the necessary permits and relying on experienced professionals allows you to face each phase with confidence, avoiding errors and waste of time.
Plan carefully, choose the right partners, and transforming your home will be a rewarding and serene experience.