Superbonus 110%: the use of innovative materials penalized

CATEGORY: Superbonus

The risk of exceeding the maximum capacity could discourage the use of innovative materials and technologies due to their high unit cost.

The double economic limit to which redevelopment interventions are subject to candidates to benefit from the 110% Superbonus could penalize the use of innovative materials in the construction of the works.

Let’s see why by reading and commenting on the article that appeared in the Sole 24ore on Tuesday 1 December signed by Luca Rollino and entitled “Congruity penalizes innovative materials”

Based on what is stated in Article 14 of Legislative Decree 63/2013, the legislator has set a double economic limit for interventions that would like to access the 110% benefits:

  • it has limited the price of the individual process, defining the fairness of the price through regional price lists or referring to the Dei or even to the analysis drawn up by the qualified technician.
  • it limited the maximum eligible expense, thus defining the capacity of the intervention and setting a limit on the overall cost of the intervention for each real estate unit concerned, also including: execution of the works, costs for professional expenses, VAT and ancillary charges.

We read in the text that: “since the total capacity per intervention on a building is linked only to the number of real estate units that constitute it, the mechanism of verification of adequacy/economic capacity ends up being rewarding for those buildings characterized by the many small real estate units on which redevelopment interventions carried out with traditional techniques and materials are required.”

The use of innovative materials suffers from the fact that they have a higher unit cost than traditional ones and therefore from the risk of reaching and exceeding the capacity established for the intervention.

This could also happen for larger apartments if you decide to use traditional methods and materials anyway.

The cause could be sought in the fact that the Ministry of Economic Development has set lower spending limits, reduced capacity with regard to the Superbonus compared to other bonuses that have greater capacity limits.

For this reason, it is very important to analyze all possible scenarios well in the preliminary phase of the works, i.e. the decision-making and design phase.

Access to the Superbonus could be more laborious also due to the double reference also with regard to the technical parameters, in fact it is necessary to consider:

  • the ordinary requirements defined by Annexes E, F, G and H of the Ministerial Decree Requirements
  • ultra-ordinary requirements such as the double jump in energy class

To this are added other elements that can erode the maximum capacity such as the need for the electronic submission of documents attesting to the asseveration by a technician together with the acquisition of the compliance visa in the event of credit assignment or invoice discount.

As already mentioned above, it is important to analyze the situation of the property you intend to redevelop and the extent of the interventions we are going to carry out, in some cases in fact it may be more convenient to resort to bonuses with lower rates but with greater capacity.

The content of this article is provided for informational purposes only. It does not constitute professional advice and does not replace the advice of qualified experts. Before taking any action based on what you have read, you are advised to consult professionals competent for your specific situation. The author and the site do not assume responsibility for any errors, omissions or regulatory updates subsequent to publication.